Outshine Solutions US Data Center is based in Chicago Facility of Hurricane Electric. Our Network Operations Center has an international internet backbone is considered to be one of the best connections world-wide. Some of the names include Level(3), Abovenet, Savvis, PCCW, Telia and Cogent. Connections ranging from OC192, OC48, and 10GigE (10,000Mbps) form rings connecting Hurricane core routers.
An in-house developed self-healing network architecture ensures that there are no blackholes or failure points within the core network. On top of our own backbone, as part of our redundancy program we also have multiple Tier III connections from different locations. This also assures that your data arrives via the shortest and the fastest available network route.
Hurricane Electric’s network utilizes Border Gateway Protocol Version 4 (BGP4) over dark fiber and long haul wavelengths. We always update the router’s software after we have stress tested the latest software on a non-critical router, to make sure it is very stable. The switch that your equipment will ultimately be connected to is connected back to a core router via fiber. All equipments & parts used are branded. So you never have to worry about hardware failure.
Network
Data Center is connected to the Internet with highly redundant network through multiple Gigabit backbones having multiple peering with other networks.
Hardware Guarantee
Servers deployed at the Data Center includes hardware replacement guarantee. In case of any hardware failure, the hardware is immediately replaced.
Security
Manned, on-site security is present 24/7/365. Keycard system is in place for after-hours building entry and floor access.
Electrical Capacity
Typical power allocation is approximately 40 watts per sq. ft. expandable to 80 watts per sq. ft. Each cabinet and 4′ x 6′ cage receives a 110 volt, 20 amp circuit. Main power is 480 volt, 3 phase.Multiple DC power supplies are now available.
Power
Market Post Tower has 480 volt, 3-phase power delivered to the central power riser on each floor via a conduit riser system. Power allocated is based on the tenant’s actual demonstrated loads. Typical power allocation is approximately 40 watts per sq. ft. expandable to 80 watts per sq. ft.
Precision Environment
Computerized Fully master-planned rise system / HVAC pipe system / Electrically monitored. HVAC (Heating Ventilation Air Conditioning) systems are N+1 redundant, ensuring that a duplicate system can immediately come online in the event of an HVAC system failure.
Fire Protection System
Existing wet system can be converted to a pre-action system. FM-200 system can be installed. Meet-Me Room is a zoned pre-action system.
USA Datacenter Tour
![]() Alternate Power |
![]() Online UPS |
![]() Cabling |
![]() Server Racks |
![]() Dell Servers |
![]() Dell Power edge racks |
![]() Technician Cabling |
![]() Server Cage |
![]() Blade Servers |
![]() Clusters |
![]() Load Balanced |
![]() InterNap |
Hope you enjoyed tour of our USA Datacenter Tour. Hosting plans are available at http://outshinesolutions.com/web-hosting/